CBY Airport Water Extension
← Drawings

Drawing set, conformed through Addendum 5

Revision AD5 is the current revision.

Current revision AD5

Oct 13, 2025 · 86.3 MB

Addendum 4 conformed sheets with the four Addendum 5 sheets swapped in. Assembled from the public bid documents.

Revisions

1 revision
RevisionIssuedNoteFileUploaded
AD5 CurrentOct 13, 2025Addendum 4 conformed sheets with the four Addendum 5 sheets swapped in. Assembled from the public bid documents.Drawings conformed through Addendum 5.pdfBluebeamTorgen Soderlund
Oct 10, 2026, 9:39 PM

Linked from

No records cite this document.

Details

Folder
Drawings
Title
Drawing set, conformed through Addendum 5
Discipline
General
Library number
DOC-0001
Current revision
AD5
Issued
Oct 13, 2025
Last updated
Oct 10, 2026, 9:39 PM

History

Append-only
  1. Torgen Soderlund (Contractor) · Added to the library at revision AD5
    Oct 10, 2026, 9:39 PM
    Addendum 4 conformed sheets with the four Addendum 5 sheets swapped in. Assembled from the public bid documents.