CBY Airport Water Extension
← Specifications

33 11 00 Water Distribution Piping

Revision AD2 is the current revision.

Current revision AD2

Sep 17, 2025 · 149 KB

Addendum 2: section replaced. Addendum 1 added 2.14 Tracer Wire and replaced 4.02; Addendum 3 added 2.x C (IPS pipe and fittings), replaced 2.14 Tracer Wire and added 4.02 F.

Revisions

2 revisions
RevisionIssuedNoteFileUploaded
AD2 CurrentSep 17, 2025Addendum 2: section replaced. Addendum 1 added 2.14 Tracer Wire and replaced 4.02; Addendum 3 added 2.x C (IPS pipe and fittings), replaced 2.14 Tracer Wire and added 4.02 F.33 11 00 AD2.pdfBluebeamTorgen Soderlund
Oct 10, 2026, 10:00 PM
0 SupersededAug 18, 2025Issued for bid, August 202533 11 00 rev 0.pdfBluebeamTorgen Soderlund
Oct 10, 2026, 10:00 PM

Linked from

8 records

Details

Folder
Specifications
Section number
33 11 00
Title
Water Distribution Piping
Library number
DOC-0213
Current revision
AD2
Issued
Sep 17, 2025
Last updated
Oct 10, 2026, 10:00 PM

Text

11 pages are searchable. The search reads the current revision.

History

Append-only
  1. Torgen Soderlund (Contractor) · Added to the library at revision 0
    Oct 10, 2026, 10:00 PM
    Issued for bid, August 2025
  2. Torgen Soderlund (Contractor) · Uploaded revision AD2. Revision 0 is superseded
    Oct 10, 2026, 10:00 PM
    Addendum 2: section replaced. Addendum 1 added 2.14 Tracer Wire and replaced 4.02; Addendum 3 added 2.x C (IPS pipe and fittings), replaced 2.14 Tracer Wire and added 4.02 F.