CBY Airport Water Extension
← General files

MODEL Pipe model

Revision 5 is the current revision.

Current revision 5

Oct 12, 2026 · 149 KB

Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py). Content 7de934e8b0cf.

This file type opens in its own application. Download it to view.

Revisions

5 revisions
RevisionIssuedNoteFileUploaded
5 CurrentOct 12, 2026Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py). Content 7de934e8b0cf.pipe-model.jsonTorgen Soderlund
Oct 11, 2026, 9:11 PM
4 SupersededOct 12, 2026Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py). Content 619db0845b12.pipe-model.jsonTorgen Soderlund
Oct 11, 2026, 6:12 PM
3 SupersededOct 12, 2026Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py). Content 4607d0799de6.pipe-model.jsonTorgen Soderlund
Oct 11, 2026, 6:10 PM
2 SupersededOct 12, 2026Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py). Content a3f38f8688be.pipe-model.jsonTorgen Soderlund
Oct 11, 2026, 4:23 PM
1 SupersededOct 12, 2026Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py). Content 2c931ef5da0e.pipe-model.jsonTorgen Soderlund
Oct 11, 2026, 4:16 PM

Linked from

No records cite this document.

Details

Folder
General files
Code
MODEL
Title
Pipe model
Library number
DOC-0237
Current revision
5
Issued
Oct 12, 2026
Last updated
Oct 11, 2026, 4:16 PM

History

Append-only
  1. Torgen Soderlund (Contractor) · Uploaded revision 2. Revision 1 is superseded
    Oct 11, 2026, 4:23 PM
    Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py).
  2. Torgen Soderlund (Contractor) · Uploaded revision 3. Revision 2 is superseded
    Oct 11, 2026, 6:10 PM
    Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py).
  3. Torgen Soderlund (Contractor) · Uploaded revision 4. Revision 3 is superseded
    Oct 11, 2026, 6:12 PM
    Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py).
  4. Torgen Soderlund (Contractor) · Uploaded revision 5. Revision 4 is superseded
    Oct 11, 2026, 9:11 PM
    Water main, tank and pump house read from the bid set drawings (model/scripts/build_model.py).