CBY Airport Water Extension

Submittal 295

Equipment weight distribution and isolator load calculations
CBY Airport Water Extension
Project I0297.24002
Airport Road, Yakutat, Alaska 99689
Owner: City and Borough of Yakutat
Engineer: RESPEC
Specification section
23 05 48
Type
Calculations
Status
Not yet submitted

Description

Specification 23 05 48 Mechanical Sound, Vibration, and Seismic Control, paragraph 1.05 E. Detailed calculations showing the weight distribution for each equipment support point (as calculated, not averaged) and the loads at each isolator.

Disposition

☐ Approved☐ Approved as noted☐ Revise and resubmit☐ Rejected☐ For record only

History

Printed Oct 12, 2026, 8:55 AM by VisitorWorkhorse · Hesiod Holdings