Submittal 551
Transfer switch field test and inspection reports
CBY Airport Water Extension
Project I0297.24002
Airport Road, Yakutat, Alaska 99689
Owner: City and Borough of Yakutat
Engineer: RESPEC
- Specification section
- 26 36 00
- Type
- Test report
- Status
- Not yet submitted
Description
Specification 26 36 00 Transfer Switches, paragraph 1.04 B. Field quality-control reports; per 3.03 D and G report results in writing recording relay settings, insulation and contact resistances, and time delays, tests administered by factory-authorized service representative per NETA ATS and run concurrently with generator tests. During construction.
Disposition
☐ Approved☐ Approved as noted☐ Revise and resubmit☐ Rejected☐ For record only