Submittals
← Submittals

718 Initialed final inspection punch list

Details

Specification section
40 05 00
Type
Closeout
Priority
Low
Description
Specification 40 05 00 Basic Requirements for Process Mechanical, paragraph 1.14 B. When all punch list items have been rectified, initial each line item and return the list to the Engineer for verification; later engineering inspections are back-charged. Closeout. Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.

718 Initialed final inspection punch list · CBY Airport Water Extension