← Submittals
718 Initialed final inspection punch list
Details
- Specification section
- 40 05 00
- Type
- Closeout
- Priority
- Low
- Description
- Specification 40 05 00 Basic Requirements for Process Mechanical, paragraph 1.14 B. When all punch list items have been rectified, initial each line item and return the list to the Engineer for verification; later engineering inspections are back-charged. Closeout. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.