Submittals
← Submittals

632 Contaminated soils post-construction reports

Details

Specification section
31 20 00
Type
Test report
Priority
Low
Description
Specification 31 20 00 Earth Moving, paragraph 1.06 D.1. Contaminated Soils Testing and Reporting: Post Construction Reports as defined in Section 14 of the Contaminated Materials Management Plan (CMMP). Closeout. Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.