← Submittals
610 SWPPP Preparer site visit documentation
Details
- Specification section
- 31 00 00
- Type
- Other
- Priority
- Low
- Description
- Specification 31 00 00 Erosion, Sediment, and Pollution Control, paragraph 3.01 C. Document the SWPPP Preparer's required pre-construction site visit in the SWPPP, including the date and names of personnel participating; Construction Activity may not begin until documented (3.04 D.4). Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.