← Submittals
604 Contractor Notice of Intent (NOI) copy
Details
- Specification section
- 31 00 00
- Type
- Other
- Priority
- Normal
- Description
- Specification 31 00 00 Erosion, Sediment, and Pollution Control, paragraph 1.05 E.3. Submit an NOI for the Project to ADEC and submit one copy to the Engineer of Record when the NOI is submitted; both the Developer's and Contractor's NOIs must show Active status on the ADEC website before Construction Activity begins (3.04 D.3).
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.