Submittals
← Submittals

701 One-year warranty coating inspection video

Details

Specification section
33 16 13
Type
Closeout
Priority
Normal
Description
Specification 33 16 13 Potable Water Storage Tank, Bolted Steel Construction, paragraph 3.08 B. Upon completion of the one-year warranty period provide an inspection of the tank coating, preferably by submersible camera; provide two copies of the video, one to the City and one to RESPEC Engineers. Closeout.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.