← Submittals
701 One-year warranty coating inspection video
Details
- Specification section
- 33 16 13
- Type
- Closeout
- Priority
- Normal
- Description
- Specification 33 16 13 Potable Water Storage Tank, Bolted Steel Construction, paragraph 3.08 B. Upon completion of the one-year warranty period provide an inspection of the tank coating, preferably by submersible camera; provide two copies of the video, one to the City and one to RESPEC Engineers. Closeout.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.