← Submittals
613 SWPPP inspection reports
Details
- Specification section
- 31 00 00
- Type
- Other
- Priority
- Normal
- Description
- Specification 31 00 00 Erosion, Sediment, and Pollution Control, paragraph 3.06 I.4. Superintendent signs and certifies each inspection report on the day of inspection and provides it to the Engineer of Record the same day; EOR signs and returns the original within three working days. During construction.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.