← Submittals
619 Concrete washout area and waste disposal plan
Details
- Specification section
- 31 00 00a
- Type
- Work plan
- Priority
- Low
- Description
- Specification 31 00 00a Erosion and Sediment Control Plan Narrative, paragraph 3.3. If any concrete is used on the project site there must be an established and signed concrete washout area and a plan for washout waste disposal; washout cannot be disposed of on-site. During construction. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.