Submittals
← Submittals

619 Concrete washout area and waste disposal plan

Details

Specification section
31 00 00a
Type
Work plan
Priority
Low
Description
Specification 31 00 00a Erosion and Sediment Control Plan Narrative, paragraph 3.3. If any concrete is used on the project site there must be an established and signed concrete washout area and a plan for washout waste disposal; washout cannot be disposed of on-site. During construction. Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.