← Submittals
109 Concrete field quality-control test and inspection reports
Details
- Specification section
- 03 30 00
- Type
- Test report
- Priority
- Normal
- Description
- Specification 03 30 00 Cast-In-Place Concrete, paragraph 1.04 E. Contractor's testing agency reports results in writing to Owner, Engineer, Contractor and concrete manufacturer within 72 hours of tests and inspections (3.14 B.3); covers slump, air, temperature, density and 7- and 28-day compressive strength. During construction.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.