Submittals
← Submittals

631 Traffic control plan

Details

Specification section
31 20 00
Type
Work plan
Priority
Low
Description
Specification 31 20 00 Earth Moving, paragraph 1.06 C.1.d.14. Plan for traffic control, required as a component of the excavation and trenching plan. Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.