← Submittals
603 Signed and certified SWPPP (Contractor and EOR certification)
Details
- Specification section
- 31 00 00
- Type
- Certificate
- Priority
- Normal
- Description
- Specification 31 00 00 Erosion, Sediment, and Pollution Control, paragraph 1.05 E.2. The Contractor and the Engineer of Record must sign and certify the approved SWPPP per CGP Appendix F before the Contractor submits the NOI to ADEC; the certification statement cannot be amended or edited.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.