Submittals
← Submittals

89 AIS/BABA waiver request documentation (only if foreign iron, steel, manufactured products, or construction materials are proposed)

Details

Specification section
01 80 00
Type
Other
Priority
Low
Description
Specification 01 80 00 American Iron and Steel (AIS) and Build America-Buy America (BABA) Act, paragraph 1.05 A. Any request to use foreign iron or steel must include a description of the foreign and domestic goods, unit, quantity, cost, delivery time, project location, proposed supplier, and detailed justification; BABA waiver requests follow the EPA instructions and content of 1.07 A and E, and the section frames the request as the recipient's (Owner's), with Contractor supplying the supporting information. During construction. Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.