Submittals
← Submittals

236 AHJ-signed piping inspection reports (rough-in and final)

Details

Specification section
22 11 16
Type
Test report
Priority
Normal
Description
Specification 22 11 16 Domestic Water Piping, paragraph 3.11 A.1.d. Prepare inspection reports and have them signed by authorities having jurisdiction; notify AHJ at least one day before inspection. During construction.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.