Submittals
← Submittals

708 Sanitary sewer hydrostatic leakage test results

Details

Specification section
33 31 13
Type
Test report
Priority
Low
Description
Specification 33 31 13 Sanitary Utility Sewerage Piping, paragraph 3.06 A. Hydrostatic test with 6 feet of head above the upper end held 4 hours for absorption then 1 hour for leakage, allowable E = 0.002 x D x L gallons per hour; repeat after repairs until within allowance. During construction. Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.