← Submittals
196 Field quality-control reports (sleeve and sleeve-seal leak tests)
Details
- Specification section
- 22 05 00
- Type
- Test report
- Priority
- Normal
- Description
- Specification 22 05 00 Common Work Results for Plumbing, paragraph 1.04 B. Informational submittal; 3.09 A requires leak testing of sleeves and sleeve seals after full cure and preparation of test and inspection reports. During construction.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.