← Submittals
620 Permit-required plans and specifications
Details
- Specification section
- 31 00 00a
- Type
- Other
- Priority
- Low
- Description
- Specification 31 00 00a Erosion and Sediment Control Plan Narrative, paragraph 3.4. Contractor shall submit to the Engineer of Record all plans and specifications required to be submitted to the permitting agency by the permittee, before starting construction. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.