717 Substitution request for manufacturers other than basis of design
Details
- Specification section
- 40 05 00
- Type
- Other
- Priority
- Low
- Description
- Specification 40 05 00 Basic Requirements for Process Mechanical, paragraph 1.13 B. Other manufacturers desiring acceptance to bid must submit for prior approval per the Division 1 procedure; the substitutor is responsible for space, performance, and structural consequences. Read from the section with medium confidence; confirm the requirement before sending.