← Submittals
1 List of proposed Subcontractors and Suppliers (water storage tank installer, electrical and controls)
Details
- Specification section
- 00 2
- Type
- Other
- Priority
- Low
- Description
- Specification 00 2 Instructions to Bidders for Construction Contract, paragraph Article 10.01. Apparent Successful Bidder must submit to Owner, within five days after Bid opening, a list of the Subcontractors or Suppliers proposed for the water storage tank installer, electrical and controls. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.