CBY Airport Water Extension

Submittal 113

Foundation modification submittal for Contractor's proposed metal building (if required)
CBY Airport Water Extension
Project I0297.24002
Airport Road, Yakutat, Alaska 99689
Owner: City and Borough of Yakutat
Engineer: RESPEC
Specification section
03 30 00
Type
Shop drawing
Status
Not yet submitted

Description

Specification 03 30 00 Cast-In-Place Concrete, paragraph 1.05 E. If the foundation must change to suit the Contractor's metal building, a full submittal of all proposed changes including detailed drawings shall be provided for review and approval, at no added cost up to 10 percent additional concrete and reinforcing.

Disposition

☐ Approved☐ Approved as noted☐ Revise and resubmit☐ Rejected☐ For record only

History