Submittals
← Submittals

113 Foundation modification submittal for Contractor's proposed metal building (if required)

Details

Specification section
03 30 00
Type
Shop drawing
Priority
Normal
Description
Specification 03 30 00 Cast-In-Place Concrete, paragraph 1.05 E. If the foundation must change to suit the Contractor's metal building, a full submittal of all proposed changes including detailed drawings shall be provided for review and approval, at no added cost up to 10 percent additional concrete and reinforcing.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.