Submittal 65
Traffic Control Plan
CBY Airport Water Extension
Project I0297.24002
Airport Road, Yakutat, Alaska 99689
Owner: City and Borough of Yakutat
Engineer: RESPEC
- Specification section
- 01 50 00
- Type
- Work plan
- Status
- Not yet submitted
Description
Specification 01 50 00 Temporary Facilities and Controls, paragraph 1.04 A. Action submittal for the entire project two weeks prior to the start of construction; 3.04 B.17 separately requires a detailed Traffic Control Plan to Engineer for approval two weeks prior to the preconstruction conference, specific to Contractor's schedule and methods and addressing critical crossings individually.
Disposition
☐ Approved☐ Approved as noted☐ Revise and resubmit☐ Rejected☐ For record only