65 Traffic Control Plan
Details
- Specification section
- 01 50 00
- Type
- Work plan
- Priority
- Normal
- Description
- Specification 01 50 00 Temporary Facilities and Controls, paragraph 1.04 A. Action submittal for the entire project two weeks prior to the start of construction; 3.04 B.17 separately requires a detailed Traffic Control Plan to Engineer for approval two weeks prior to the preconstruction conference, specific to Contractor's schedule and methods and addressing critical crossings individually.