CBY Airport Water Extension

Submittal 338

Field quality-control reports (fuel-oil piping pressure and vacuum tests)
CBY Airport Water Extension
Project I0297.24002
Airport Road, Yakutat, Alaska 99689
Owner: City and Borough of Yakutat
Engineer: RESPEC
Specification section
23 11 13
Type
Test report
Status
Not yet submitted

Description

Specification 23 11 13 Facility Fuel-Oil Piping, paragraph 1.03 F. 3.08 requires distribution piping tested at 1.5 times maximum working pressure (minimum 5 psig) for 30 minutes, suction piping at 20 in. Hg vacuum for 30 minutes, per NFPA 31 and AHJ, and preparation of test and inspection reports. During construction.

Disposition

☐ Approved☐ Approved as noted☐ Revise and resubmit☐ Rejected☐ For record only

History

Printed Oct 12, 2026, 8:57 AM by VisitorWorkhorse · Hesiod Holdings