Submittals
← Submittals

338 Field quality-control reports (fuel-oil piping pressure and vacuum tests)

Details

Specification section
23 11 13
Type
Test report
Priority
Normal
Description
Specification 23 11 13 Facility Fuel-Oil Piping, paragraph 1.03 F. 3.08 requires distribution piping tested at 1.5 times maximum working pressure (minimum 5 psig) for 30 minutes, suction piping at 20 in. Hg vacuum for 30 minutes, per NFPA 31 and AHJ, and preparation of test and inspection reports. During construction.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.