← Submittals
15 Evidence of source, kind, and quality of materials and equipment
Details
- Specification section
- 00 13
- Type
- Certificate
- Priority
- Low
- Description
- Specification 00 13 Standard General Conditions of the Construction Contract, paragraph Article 7.04 B. If required by Engineer, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. During construction. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.