← Specifications
00 13 Standard General Conditions of the Construction Contract
Revision 0 is the current revision.
Current revision 0
Aug 18, 2025 · 600 KBIssued for bid, August 2025
Revisions
1 revision| Revision | Issued | Note | File | Uploaded |
|---|---|---|---|---|
| 0 Current | Aug 18, 2025 | Issued for bid, August 2025 | 00 13 rev 0.pdfBluebeam | Torgen Soderlund Oct 10, 2026, 9:58 PM |
Linked from
21 records- 8 Performance bond
- 9 Payment bond
- 10 Certificates of insurance and endorsements
- 11 Progress Schedule, preliminary
- 12 Schedule of Submittals, preliminary
- 13 Schedule of Values, preliminary
- 14 Designation of Contractor's authorized representative
- 15 Evidence of source, kind, and quality of materials and equipment
- 16 Identity of proposed Subcontractors and Suppliers for Owner acceptance
- 17 Record documents (annotated printed record copy)
- 18 Designation of Contractor's safety representative
- 19 Contractor's safety program requirements applicable to Owner and Engineer personnel
- 20 Shop Drawings and Samples, general requirement
- 21 Owner-delegated design submittals (sealed drawings, calculations, specifications, certifications)
- 22 Certificates of inspection or approval from public bodies having jurisdiction
- 23 Notice of Substantial Completion with initial draft punch list
- 24 Warranties, guarantees, and special bonds (delivered before final Application for Payment)
- 25 Consent of surety to final payment
- 26 Evidence that title to Work, materials, and equipment has passed to Owner free of liens
- 27 List of all pending Change Proposals and Claims
- 28 Releases or waivers of lien rights (or Contractor's affidavit with receipts in full)
Details
- Folder
- Specifications
- Section number
- 00 13
- Title
- Standard General Conditions of the Construction Contract
- Library number
- DOC-0113
- Current revision
- 0
- Issued
- Aug 18, 2025
- Last updated
- Oct 10, 2026, 9:58 PM
Text
76 pages are searchable. The search reads the current revision.
History
Append-only- Torgen Soderlund (Contractor) · Added to the library at revision 0Oct 10, 2026, 9:58 PMIssued for bid, August 2025