← Submittals
21 Owner-delegated design submittals (sealed drawings, calculations, specifications, certifications)
Details
- Specification section
- 00 13
- Type
- Calculations
- Priority
- Low
- Description
- Specification 00 13 Standard General Conditions of the Construction Contract, paragraph Article 7.19 B. Where the Contract Documents delegate professional design services to Contractor, all drawings, calculations, specifications, certifications, and Submittals for that design must bear the signature and seal of Contractor's properly licensed design professional and the design professional's written approval (Article 7.19 C). During construction. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.