← Submittals
20 Shop Drawings and Samples, general requirement
Details
- Specification section
- 00 13
- Type
- Shop drawing
- Priority
- Normal
- Description
- Specification 00 13 Standard General Conditions of the Construction Contract, paragraph Article 7.16 B. Label and submit Shop Drawings and Samples to Engineer per the accepted Schedule of Submittals, in the number of copies required by the Specifications, each bearing Contractor's review stamp or certification and accompanied by separate written notice of any variations from the Contract Documents (Article 7.16 A.2, A.3). During construction.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.