Submittals
← Submittals

600 Spill Prevention, Control and Countermeasure Plan (SPCC)

Details

Specification section
31 00 00
Type
Work plan
Priority
Normal
Description
Specification 31 00 00 Erosion, Sediment, and Pollution Control, paragraph 1.05 C.1. When SPCC is required under 3.03 (>1,320 gal above-ground oil storage and spill may reach navigable waters), submit one signed copy to the Engineer of Record at least 14 calendar days before beginning construction activity; EOR keeps it as a record document.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.