← Submittals
751 PCS submittal schedule for multiple submissions
Details
- Specification section
- 40 60 00
- Type
- Schedule
- Priority
- Low
- Description
- Specification 40 60 00 Process Control System, paragraph 1.04 A.1. If multiple submissions are required, first submit a coordinated schedule with the proposed date and content of each submission, and include an updated schedule with highlighted changes in each subsequent submission. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.