← Submittals
712 Culvert field quality-control and backfill density reports
Details
- Specification section
- 33 41 00
- Type
- Test report
- Priority
- Normal
- Description
- Specification 33 41 00 Storm Utility Drainage Piping, paragraph 1.06 B. Field quality-control reports; field densities on each culvert installation, one at the spring line and one per each foot of trench backfill above the top of pipe (3.06 A), plus interior inspection after 12 inches of backfill and at project completion (3.05 A). During construction.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.