← Submittals
695 Tank manufacturer's painting schedule
Details
- Specification section
- 33 16 13
- Type
- Work plan
- Priority
- Low
- Description
- Specification 33 16 13 Potable Water Storage Tank, Bolted Steel Construction, paragraph 2.04 B.4. Submit to the Owner for approval the tank manufacturer's proposed painting schedule including spreading rate per coat, minimum DFT per coat, application temperature, curing time and temperature, humidity limits, and paint and thinner for the final coat; approved in writing by the Owner prior to application (overlaps 1.06 C). Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.