Submittals
← Submittals

695 Tank manufacturer's painting schedule

Details

Specification section
33 16 13
Type
Work plan
Priority
Low
Description
Specification 33 16 13 Potable Water Storage Tank, Bolted Steel Construction, paragraph 2.04 B.4. Submit to the Owner for approval the tank manufacturer's proposed painting schedule including spreading rate per coat, minimum DFT per coat, application temperature, curing time and temperature, humidity limits, and paint and thinner for the final coat; approved in writing by the Owner prior to application (overlaps 1.06 C). Read from the section with medium confidence; confirm the requirement before sending.

Files

No files attached.

Drawings and specifications

History

Append-only

No history yet.