← Submittals
671 Drilling slurry contamination test results
Details
- Specification section
- 33 05 23.13
- Type
- Test report
- Priority
- Low
- Description
- Specification 33 05 23.13 Horizontal Directional Drilling, paragraph 3.04 B. When working in an area of contaminated ground, the slurry shall be tested for contamination and disposed of in a manner that meets government requirements. During construction. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.