CBY Airport Water Extension
← Specifications

33 05 23.13 Horizontal Directional Drilling

Revision 0 is the current revision.

Current revision 0

Aug 18, 2025 · 96 KB

Issued for bid, August 2025. Addendum 2 removed 3.01 A; Addendum 3 replaced 1.06 E and added 3.03 G; Addendum 4 added 2.04 Polyurethane Insulation, 2.05 Waterproof Surface Coating, 3.02 G and replaced the pay items.

Revisions

1 revision
RevisionIssuedNoteFileUploaded
0 CurrentAug 18, 2025Issued for bid, August 2025. Addendum 2 removed 3.01 A; Addendum 3 replaced 1.06 E and added 3.03 G; Addendum 4 added 2.04 Polyurethane Insulation, 2.05 Waterproof Surface Coating, 3.02 G and replaced the pay items.33 05 23.13 rev 0.pdfBluebeamTorgen Soderlund
Oct 10, 2026, 10:00 PM

Linked from

13 records

Details

Folder
Specifications
Section number
33 05 23.13
Title
Horizontal Directional Drilling
Library number
DOC-0212
Current revision
0
Issued
Aug 18, 2025
Last updated
Oct 10, 2026, 10:00 PM

Text

8 pages are searchable. The search reads the current revision.

History

Append-only
  1. Torgen Soderlund (Contractor) · Added to the library at revision 0
    Oct 10, 2026, 10:00 PM
    Issued for bid, August 2025. Addendum 2 removed 3.01 A; Addendum 3 replaced 1.06 E and added 3.03 G; Addendum 4 added 2.04 Polyurethane Insulation, 2.05 Waterproof Surface Coating, 3.02 G and replaced the pay items.