Current revision 0
Aug 18, 2025 · 96 KBIssued for bid, August 2025. Addendum 2 removed 3.01 A; Addendum 3 replaced 1.06 E and added 3.03 G; Addendum 4 added 2.04 Polyurethane Insulation, 2.05 Waterproof Surface Coating, 3.02 G and replaced the pay items.
Revisions
1 revision| Revision | Issued | Note | File | Uploaded |
|---|---|---|---|---|
| 0 Current | Aug 18, 2025 | Issued for bid, August 2025. Addendum 2 removed 3.01 A; Addendum 3 replaced 1.06 E and added 3.03 G; Addendum 4 added 2.04 Polyurethane Insulation, 2.05 Waterproof Surface Coating, 3.02 G and replaced the pay items. | 33 05 23.13 rev 0.pdfBluebeam | Torgen Soderlund Oct 10, 2026, 10:00 PM |
Linked from
13 records- 660 American Iron and Steel / Build America Buy America certificates
- 661 HDD contractor, subcontractor and supervisor qualifications
- 662 HDD bore plan (methodology for each crossing)
- 663 HDD schedule of work
- 664 HDD work site layout drawing
- 665 Drilling fluid management plan
- 666 Utility strike emergency procedures
- 667 HDD environmental monitoring plan (inadvertent returns / frac-outs)
- 668 HDD pipe tensile strength and minimum bending radius data
- 669 HDD drilling log and guidance system records (as-drilled line and grade)
- 670 HDPE pipe fusion compatibility certification
- 671 Drilling slurry contamination test results
- 672 Waste disposal permits (drilling fluid and cuttings)
Details
- Folder
- Specifications
- Section number
- 33 05 23.13
- Title
- Horizontal Directional Drilling
- Library number
- DOC-0212
- Current revision
- 0
- Issued
- Aug 18, 2025
- Last updated
- Oct 10, 2026, 10:00 PM
Text
8 pages are searchable. The search reads the current revision.
History
Append-only- Torgen Soderlund (Contractor) · Added to the library at revision 0Oct 10, 2026, 10:00 PMIssued for bid, August 2025. Addendum 2 removed 3.01 A; Addendum 3 replaced 1.06 E and added 3.03 G; Addendum 4 added 2.04 Polyurethane Insulation, 2.05 Waterproof Surface Coating, 3.02 G and replaced the pay items.