← Submittals
802 Pre-installation examination report
Details
- Specification section
- 40 60 00
- Type
- Other
- Priority
- Low
- Description
- Specification 40 60 00 Process Control System, paragraph 3.01 D. Prepare a written report, endorsed by the Installer, listing conditions detrimental to performance of the Work; proceed only after unsatisfactory conditions are corrected. During construction. Read from the section with medium confidence; confirm the requirement before sending.
Files
No files attached.
Drawings and specifications
History
Append-onlyNo history yet.