Documents
127 documents in the current set. 126 with searchable text.
Complete sets
Open with bookmarks| Section | Title | Revision | Issued | Text |
|---|---|---|---|---|
| 46 33 00 | Liquid Chemical Feed System | 0 | Aug 18, 2025 | Searchable |
| 42 23 31 | Vertical and Horizontal Centrifugal Booster Pumps | 0 | Aug 18, 2025 | Searchable |
| 40 75 21 | Chlorine Analyzer | 0 | Aug 18, 2025 | Searchable |
| 40 71 13 | Electromagnetic Flow Meter, Liquid, Single-Channel | 0 | Aug 18, 2025 | Searchable |
| 40 60 00a | Process Control System, Attachment A: Control Narrative | AD3 | Sep 25, 2025 | Searchable |
| 40 60 00 | Process Control System | 0 | Aug 18, 2025 | Searchable |
| 40 05 97 | Identification for Plumbing Piping and Equipment | 0 | Aug 18, 2025 | Searchable |
| 40 05 51 | Plant Valves | 0 | Aug 18, 2025 | Searchable |
| 40 05 20 | Pipe and Fittings | 0 | Aug 18, 2025 | Searchable |
| 40 05 07 | Hangers and Supports for Process Piping and Equipment | 0 | Aug 18, 2025 | Searchable |
| 40 05 00 | Basic Requirements for Process Mechanical | 0 | Aug 18, 2025 | Searchable |
| 33 41 00 | Storm Utility Drainage Piping | 0 | Aug 18, 2025 | Searchable |
| 33 31 13 | Sanitary Utility Sewerage Piping | 0 | Aug 18, 2025 | Searchable |
| 33 16 13 | Potable Water Storage Tank, Bolted Steel Construction | AD5 | Oct 13, 2025 | Searchable |
| 33 11 00 | Water Distribution Piping | AD2 | Sep 17, 2025 | Searchable |
| 33 05 23.13 | Horizontal Directional Drilling | 0 | Aug 18, 2025 | Searchable |
| 32 92 00 | Turf and Grasses | 0 | Aug 18, 2025 | Searchable |
| 32 31 13 | Chain Link Fences and Gates | 0 | Aug 18, 2025 | Searchable |
| 32 12 16 | Asphalt Paving | 0 | Aug 18, 2025 | Searchable |
| 31 23 19 | Dewatering | 0 | Aug 18, 2025 | Searchable |
| 31 23 19 | Field Screening | AD2 | Sep 17, 2025 | Searchable |
| 31 20 00 | Earth Moving | AD2 | Sep 17, 2025 | Searchable |
| 31 10 00 | Site Clearing | AD3 | Sep 25, 2025 | Searchable |
| 31 00 00a | Erosion and Sediment Control Plan Narrative | 0 | Aug 18, 2025 | Searchable |
| 31 00 00 | Erosion, Sediment, and Pollution Control | 0 | Aug 18, 2025 | Searchable |
| 27 15 13 | Communications Copper Horizontal Cabling | 0 | Aug 18, 2025 | Searchable |
| 27 05 28 | Pathways for Communications Systems | 0 | Aug 18, 2025 | Searchable |
| 26 56 13 | Lighting Poles and Standards | 0 | Aug 18, 2025 | Searchable |
| 26 50 00 | Lighting | 0 | Aug 18, 2025 | Searchable |
| 26 36 00 | Transfer Switches | 0 | Aug 18, 2025 | Searchable |
| 26 32 13.13 | Diesel-Engine-Driven Generator Sets | 0 | Aug 18, 2025 | Searchable |
| 26 29 23 | Variable-Frequency Motor Controllers | 0 | Aug 18, 2025 | Searchable |
| 26 29 13.03 | Manual and Magnetic Motor Controllers | 0 | Aug 18, 2025 | Searchable |
| 26 28 16 | Enclosed Switches and Circuit Breakers | 0 | Aug 18, 2025 | Searchable |
| 26 27 26 | Wiring Devices | 0 | Aug 18, 2025 | Searchable |
| 26 27 13 | Electricity Metering | 0 | Aug 18, 2025 | Searchable |
| 26 24 16 | Panelboards | 0 | Aug 18, 2025 | Searchable |
| 26 22 13 | Low-Voltage Distribution Transformers | 0 | Aug 18, 2025 | Searchable |
| 26 05 53 | Identification for Electrical Systems | 0 | Aug 18, 2025 | Searchable |
| 26 05 44 | Sleeves and Sleeve Seals for Electrical Raceways and Cabling | 0 | Aug 18, 2025 | Searchable |
| 26 05 43 | Underground Ducts and Raceways for Electrical Systems | 0 | Aug 18, 2025 | Searchable |
| 26 05 33.16 | Boxes and Covers for Electrical Systems | 0 | Aug 18, 2025 | Searchable |
| 26 05 33.13 | Conduits for Electrical Systems | 0 | Aug 18, 2025 | Searchable |
| 26 05 29 | Hangers and Supports for Electrical Systems | 0 | Aug 18, 2025 | Searchable |
| 26 05 26 | Grounding and Bonding for Electrical Systems | 0 | Aug 18, 2025 | Searchable |
| 26 05 23 | Control-Voltage Electrical Power Cables | 0 | Aug 18, 2025 | Searchable |
| 26 05 22 | Heat Trace Cables | 0 | Aug 18, 2025 | Searchable |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | 0 | Aug 18, 2025 | Searchable |
| 23 82 39.19 | Electric Heaters | 0 | Aug 18, 2025 | Searchable |
| 23 37 00 | Air Outlets and Inlets | 0 | Aug 18, 2025 | Searchable |
| 23 34 00 | HVAC Fans | 0 | Aug 18, 2025 | Searchable |
| 23 33 00 | Air Duct Accessories | 0 | Aug 18, 2025 | Searchable |
| 23 31 00 | HVAC Ducts and Casings | 0 | Aug 18, 2025 | Searchable |
| 23 24 16 | Internal-Combustion Engine Exhaust Piping | AD1 | Aug 28, 2025 | Searchable |
| 23 13 23 | Facility Aboveground Fuel-Oil Storage Tanks | 0 | Aug 18, 2025 | Searchable |
| 23 11 13 | Facility Fuel-Oil Piping | 0 | Aug 18, 2025 | Searchable |
| 23 09 00 | Sequence of Operations for HVAC Controls | 0 | Aug 18, 2025 | Searchable |
| 23 07 00 | HVAC Insulation | 0 | Aug 18, 2025 | Searchable |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | 0 | Aug 18, 2025 | Searchable |
| 23 05 53 | Identification for HVAC Piping and Equipment | 0 | Aug 18, 2025 | Searchable |
| 23 05 48 | Mechanical Sound, Vibration, and Seismic Control | 0 | Aug 18, 2025 | Searchable |
| 23 01 00 | General Mechanical Requirements | 0 | Aug 18, 2025 | Searchable |
| 22 42 16.16 | Commercial Sinks | 0 | Aug 18, 2025 | Searchable |
| 22 40 00 | Plumbing Fixtures | 0 | Aug 18, 2025 | Searchable |
| 22 33 00 | Electric, Domestic-Water Heaters | 0 | Aug 18, 2025 | Searchable |
| 22 13 19 | Sanitary Waste Piping Specialties | 0 | Aug 18, 2025 | Searchable |
| 22 13 16 | Sanitary Waste and Vent Piping | 0 | Aug 18, 2025 | Searchable |
| 22 11 16 | Domestic Water Piping | 0 | Aug 18, 2025 | Searchable |
| 22 07 00 | Plumbing Insulation | 0 | Aug 18, 2025 | Searchable |
| 22 05 53 | Identification for Plumbing and Equipment | 0 | Aug 18, 2025 | Searchable |
| 22 05 48 | Vibration and Seismic Controls for Plumbing Piping and Equipment | 0 | Aug 18, 2025 | Searchable |
| 22 05 29 | Hangers and Supports for Plumbing Piping and Equipment | 0 | Aug 18, 2025 | Searchable |
| 22 05 23 | Plumbing Piping Valves and Specialties | 0 | Aug 18, 2025 | Searchable |
| 22 05 00 | Common Work Results for Plumbing | 0 | Aug 18, 2025 | Searchable |
| 22 01 00 | General Plumbing Requirements | 0 | Aug 18, 2025 | Searchable |
| 13 34 19 | Metal Building Systems | 0 | Aug 18, 2025 | Searchable |
| 09 91 23 | Interior Painting | 0 | Aug 18, 2025 | Searchable |
| 09 91 13 | Exterior Painting | AD2 | Sep 17, 2025 | Searchable |
| 09 29 00 | Gypsum Board | 0 | Aug 18, 2025 | Searchable |
| 08 11 13 | Hollow Metal Doors and Frames | 0 | Aug 18, 2025 | Searchable |
| 07 92 00 | Joint Sealants | 0 | Aug 18, 2025 | Searchable |
| 07 84 13 | Penetration Firestopping | 0 | Aug 18, 2025 | Searchable |
| 07 72 53 | Snow Guards | 0 | Aug 18, 2025 | Searchable |
| 07 21 19 | Foamed-In-Place Insulation | 0 | Aug 18, 2025 | Searchable |
| 05 50 00 | Metal Fabrications | 0 | Aug 18, 2025 | Searchable |
| 03 30 00 | Cast-In-Place Concrete | 0 | Aug 18, 2025 | Searchable |
| 03 20 00 | Concrete Reinforcing | 0 | Aug 18, 2025 | Searchable |
| 02 41 19 | Selective Demolition | 0 | Aug 18, 2025 | Searchable |
| 01 80 00 | American Iron and Steel (AIS) and Build America-Buy America (BABA) Act | 0 | Aug 18, 2025 | Searchable |
| 01 78 39 | Project Record Documents | 0 | Aug 18, 2025 | Searchable |
| 01 78 23 | Operation and Maintenance Data | 0 | Aug 18, 2025 | Searchable |
| 01 77 00 | Closeout Procedures | 0 | Aug 18, 2025 | Searchable |
| 01 73 00 | Execution | 0 | Aug 18, 2025 | Searchable |
| 01 50 00 | Temporary Facilities and Controls | 0 | Aug 18, 2025 | Searchable |
| 01 42 00 | References | 0 | Aug 18, 2025 | Searchable |
| 01 40 00 | Quality Requirements | 0 | Aug 18, 2025 | Searchable |
| 01 33 00 | Submittal Procedures | 0 | Aug 18, 2025 | Searchable |
| 01 32 00 | Construction Progress Documentation | 0 | Aug 18, 2025 | Searchable |
| 01 31 00a | Request for Information Form | 0 | Aug 18, 2025 | Searchable |
| 01 31 00 | Project Management and Coordination | 0 | Aug 18, 2025 | Searchable |
| 01 29 00 | Payment Procedures | 0 | Aug 18, 2025 | Searchable |
| 01 10 00 | Summary | 0 | Aug 18, 2025 | Searchable |
| 00 18g | Disadvantaged Business Enterprise (DBE) Program Good Faith Effort and Participation Form | 0 | Aug 18, 2025 | Searchable |
| 00 18f | Disadvantaged Business Enterprise Compliance Statement | 0 | Aug 18, 2025 | Searchable |
| 00 18e | Equal Employment Opportunity Cert Form | 0 | Aug 18, 2025 | Searchable |
| 00 18d | EPA Debarment Certification | 0 | Aug 18, 2025 | Searchable |
| 00 18c | Debarment Certification Form (EPA Form 5700-49) | 0 | Aug 18, 2025 | No text layer |
| 00 18b | Minimum Rates of Pay for Laborers and Mechanics | 0 | Aug 18, 2025 | Searchable |
| 00 18a | Davis Bacon Wage Rates for Alaska | 0 | Aug 18, 2025 | Searchable |
| 00 18 | Special Conditions | 0 | Aug 18, 2025 | Searchable |
| 00 17 | Field Order | 0 | Aug 18, 2025 | Searchable |
| 00 16 | Change Order | 0 | Aug 18, 2025 | Searchable |
| 00 15 | Work Change Directive | 0 | Aug 18, 2025 | Searchable |
| 00 14 | Supplementary Conditions of the Construction Contract | 0 | Aug 18, 2025 | Searchable |
| 00 13 | Standard General Conditions of the Construction Contract | 0 | Aug 18, 2025 | Searchable |
| 00 12 | Notice of Acceptability of Work | 0 | Aug 18, 2025 | Searchable |
| 00 11 | Certificate of Substantial Completion | 0 | Aug 18, 2025 | Searchable |
| 00 10 | Contractor's Application for Payment | 0 | Aug 18, 2025 | Searchable |
| 00 9 | Payment Bond | 0 | Aug 18, 2025 | Searchable |
| 00 8 | Performance Bond | 0 | Aug 18, 2025 | Searchable |
| 00 7 | Notice to Proceed | 0 | Aug 18, 2025 | Searchable |
| 00 6 | Agreement Between Owner and Contractor for Construction Contract (stipulated Price) | 0 | Aug 18, 2025 | Searchable |
| 00 5 | Notice of Award | 0 | Aug 18, 2025 | Searchable |
| 00 4 | Bid Bond (Penal Sum Form) | 0 | Aug 18, 2025 | Searchable |
| 00 3 | Bid Form for Construction Contract | 0 | Aug 18, 2025 | Searchable |
| 00 2 | Instructions to Bidders for Construction Contract | 0 | Aug 18, 2025 | Searchable |
| 00 1 | Advertisement for Bids | 0 | Aug 18, 2025 | Searchable |
127 items